Malaysia’s Boustead Naval Shipyard Sdn Bhd held a keel laying ceremony for the third Littoral Combat Ship (LCS) ordered by the Royal Malaysia Navy (RMN). Six LCS are to be delivered to the RMN by 2023 at a total cost of RM9 billion. The second LCS is planned to be launched in October 2018, while the keel laying ceremony for the fourth LCS is scheduled to take place in the second quarter of 2018.
Asian Defence Technology
RMN Tweet
No comments:
Post a Comment